TMO Europe Bio-Fuel Plant Components, Istanbul Turkey
25 Jul 2010
TMO has loaded a 50.5 m ton ‘toaster’ over 16 meters in length. The piece has intricate technology within and has to be handled carefully all the way to Belgium, where it will be discharged directly to barge for inland navigation down to Slovakia with trucking to the final project site. TMO is working with our experienced partners to carefully manage each handling and transport along the way. The piece should arrive at the site at the end of August.